Skip to content
Elite Restorations

Cost guide

Bathroom remodel cost in Houston.

A powder-room refresh and a primary bath that moves the shower are not the same price. The difference is the room, the finishes, and whether the plumbing stays put.

What changes the price

The factors, not a flat rate.

  1. 01

    Size

    A small powder room and a primary bath are different amounts of tile, glass, and fixture. The square footage matters less than what the room has to do.

  2. 02

    Materials

    A new vanity, mirror, and light is a different scope from a full tile shower, a tub, and a stone that has to be waterproofed behind the finish you see.

  3. 03

    Layout changes

    Leaving the drain where it is costs less than moving the shower, the tub, or the vanity. In older houses the plumbing and the structure decide what can move. We check that before we promise a new layout.

  4. 04

    Permits

    Replacing a faucet in the same place is not the same as relocating a drain. Plumbing changes are when a permit usually shows up. We say so once the plan is real.

Ranges

Typical planning ranges.

  • Vanity and finish refresh$6,000 to $15,000
  • Shower rebuild, same layout$12,000 to $25,000
  • Full remodel with plumbing moves$30,000 to $65,000

These are typical planning ranges, not quotes. The final price comes from an on-site estimate.

How to read this

The drain decides more than the tile.

Bathroom prices in Houston diverge at the plumbing, not at the paint color. A vanity and finish refresh on the same layout is typically about $6,000 to $15,000. A shower rebuild that keeps the drain is typically about $12,000 to $25,000. A full remodel that moves plumbing is typically about $30,000 to $65,000. A powder room and a primary bath are not interchangeable inside those words. Glass, stone, and a second wet wall in the same house can push a project up. The visit places it.

Waterproofing sits inside the shower number. It is not a way to get from the top of a band to the bottom. Skipping it does not produce the same shower. If someone’s lower price is the same tile photo without a membrane and a sloped pan, it is a different scope. Ask what is behind the tile before you compare the two numbers.

The house

Slab, crawl space, and a window in the shower.

On a slab, typical of newer Katy, Memorial, Sugar Land, and Woodlands houses, the shower drain is in the concrete. Moving it means cutting the slab, patching it, and building the pan on that repair. On a pier-and-beam house, more common in older Heights bungalows, the drain is often in the crawl space. It is still plumbing. It is not a concrete saw. That difference alone can move a bath from the middle band toward the top, or keep a new shower in the middle because the drain stayed put.

A window in the wet wall, common in older baths, has to be detailed into the waterproofing or removed. A ceiling below that is already stained means the bath and the room under it may be one repair. Houston humidity is why the fan should exhaust outdoors and why a wall is dry before it is closed. Those are scope, not mood. They belong in the price.

  1. 01

    Same footprint

    New tile, a new valve, and new glass on the old drain are the shower-rebuild band. The moment the drain, the toilet, or the vanity supply moves, you are in a different project.

  2. 02

    One bath or two

    A hall bath used during the remodel changes how the work is phased. It does not make the wet wall free. Two showers are two assemblies.

  3. 03

    What demo finds

    Soft backer and a long-term leak add repair. We look on the visit. If the wall is worse once it is open, we stop before the number silently grows.

Finishes

Tile, glass, and the vanity are the visible money.

A porcelain field and a framed door are a different material bill from book-matched stone and frameless glass. Large-format tile needs a flatter wall, which is labor before any luxury shows up. Mosaic on the shower floor is slower than a single-pitch pan with a linear drain, and the linear drain is its own hardware. Niches, a bench, and a curb versus a curbless entry each change the waterproofing. Curbless on a slab is only real if the floor can slope to a drain. If it cannot, we will not price a picture of it.

The vanity, the top, the mirror, and the light are one elevation. A furniture-style vanity and a stone top move a refresh toward the top of its band without moving a single drain. That is still not a full remodel. Keeping a tub and retiling the surround is less than removing the tub and building a shower, even when the tile sample is the same. Compare scopes. The sample is not the scope.

Schedule

What the out-of-service days are worth.

A powder room you can close off is a different project from the only bath in the house. The construction price does not include a hotel, and we will not pretend it does. It does include the sequence: how many days the water is off, whether a tub can stay in use while a shower is rebuilt, and whether the hall bath has to be finished before the primary is opened. That sequence is why two baths are not twice one bath in a simple way. They share trips, and they still cannot both be demoed if you have nowhere to shower.

Material lead time sits in the same conversation. A stock vanity and an in-stock porcelain can start sooner than a stone top and frameless glass, which are measured after the walls are real. We do not print a week count here because those lead times move. We do put them on the estimate, next to the band the scope actually falls in. If you are choosing between a shower rebuild on the same drain and a layout that cuts the slab, the calendar is part of the price even when the labor is the line you notice first.

Permits

When the permit shows up, and when it does not.

Replacing a faucet and a vanity in the same place often does not need a building permit. Relocating a drain or adding a circuit usually does. City of Houston, Bellaire, West University Place, Sugar Land, Pearland, and the county on a Katy or Woodlands lot are not one counter. We name the office from the address. The permit fee is small next to the plumbing. The inspection is what keeps the drain and the wet wall honest.

A planned bath is not an insurance claim. A bath opened because a valve or a supply line failed starts with drying and photos, and the rebuild price is still construction. Your insurer decides what is paid. Those numbers are allowed to differ. Call (713) 909-0034 for an estimate. We look at the bath you have, including what is under it, and price that.

Bring the three bands to the visit and say which one you think you are in. If the drain has to move, or the only bath will be out of service, that is the fact that changes the schedule as much as the price. We would rather name it on the estimate than discover it after demo.

Questions

Good to know.

Why can two bathroom remodels cost so differently?

A new vanity in the same footprint is not a new shower in a new place. Tile, glass, waterproofing, and moved plumbing are the usual reasons the scope grows.

Is waterproofing part of the price?

Yes, when the shower or the wet wall is in the job. It goes in before the finish tile. It is part of that scope, not a line you can skip and keep the same result.

Do bathroom remodels need a permit in Houston?

Often when the plumbing moves. A refresh that keeps the drains and the electrical in place may not. We tell you which one applies after we see the bathroom.

How do I get a price?

Call (713) 909-0034 or request an estimate. We look at the bathroom you have and price that scope.

Why is a shower rebuild more than a new vanity?

The shower is waterproofing, a sloped pan, a valve, tile, and glass. A vanity refresh is cabinetry, a top, and light on the same footprint. They are not versions of the same project.

Does curbless glass cost the same as a tub remodel?

Usually no. Curbless means the floor can slope to a drain, which on a slab is a structural and plumbing question. A tub that stays, with a retiled surround, is a smaller wet wall. We price the one the room can actually do.

Are fixtures included in the ranges?

The ranges describe the construction scope. A special-order valve, frameless glass, or a stone you have already picked can move the material bill. The estimate names what is included. The bands are for planning, not a package of fixtures.

Can two bathrooms share one budget band?

Only if you add them. A powder room and a primary are two rooms. Doing them together saves some trips. It does not make the second shower free. We scope each wet wall.

Planning bathroom remodeling?

Call (713) 909-0034 for a free estimate. We price the scope after we see the house.